Eight Covered Slips at Scott's Landing Marina on Lake Grapevine

  • Grapevine, TX
  • Lake Grapevine
  • 8 covered slips
  • May 2024

Scott’s Landing Marina sits on Lake Grapevine, a U.S. Army Corps of Engineers flood-control reservoir in the middle of the Dallas–Fort Worth metro. One of the busiest marinas on the lake, it needed more covered slip capacity. We built eight covered floating slips.

Pile Guides Instead of Cables

We set the slips on pile-guided floating docks riding on 8-inch steel pipe pilings driven into the lakebed. Each dock wraps those pilings with guides, so it rides straight up and down as the lake moves but never drifts sideways. That matters here: the Corps of Engineers runs Lake Grapevine across a wide range, from a conservation pool around 535 feet up toward a flood limit near 572, roughly a 37-foot fluctuation. With pile guides, a boater steps onto the dock at the same height whether the lake is at pool or running high after a wet spring.

On a lake with that much vertical range, we’d rather trust pilings than a winch-and-cable rig someone has to keep adjusting. Fewer moving parts, and less for the marina to manage.

14′ × 34′, Steel and Concrete, Vented Roofs

We sized each slip 14′ wide and 34′ long, enough room for the pontoons, cruisers, and wake boats that show up on a metro lake. The framing on these docks is hot-dipped galvanized steel for corrosion resistance, with an anticipated usable lifespan of approximately 25+ years. Decking on this dock is pre-cast concrete for a solid, stable walking surface.

The owner opted to go with a vented ridge on this dock’s roof structure. This allows for more airflow under the roof, some wind-load relief, and a way for smoke to vent out the top of the roof in case of a fire.

Detail Specification
Slips added 8 covered floating slips
Slip size 14′ × 34′
Framing Hot-dipped galvanized steel
Decking Pre-cast concrete
Roof Vented ridge
Anchoring Pile-guided on 8-inch steel pipe pilings
Lake level range ~37 ft (USACE flood-control reservoir)
Completed Spring 2024

See more of our commercial marina work.

What the Marina Got

Eight covered slips at one of the busiest marinas on Lake Grapevine, finished in spring 2024 and ready to occupy. We design, build, and maintain dock systems around the conditions of the specific lake, which on Grapevine meant building for the full range of the Corps’ pool from the start.

Ready to add covered capacity at your marina? Whether you run one marina or a portfolio, we can design, build, and maintain the slips you need. Call us at (918) 715-4102 or start the conversation.

Frequently Asked Questions

How do covered slips stay level on a lake that moves this much?

The slips sit on pile-guided floating docks riding on 8-inch steel pipe pilings. The docks rise and fall with the water while staying fixed side to side, so the step-down to the dock stays the same whether Lake Grapevine is at conservation pool or running high.

Why pile guides instead of a winch-and-cable system here?

Fewer moving parts and less ongoing adjustment for the marina. On a lake with about a 37-foot range, pilings hold the docks in position reliably with less seasonal maintenance than cables.

What are the covered slips built from?

Hot-dipped galvanized steel framing for corrosion resistance, pre-cast concrete decking, and a vented-ridge roof for airflow, wind-load relief, and smoke venting.

Dock & Marina Services builds and restores marina infrastructure across fire, storm, and structural-failure recovery.

Get in touch about a project